Collaborative geospatial workspaceField edition / 2026

Put every voice
on the map.

Bring maps, layers, field updates, comments, and timelines into one shared geospatial workspace your whole team can use.

01
Maps + layers
02
Live feedback
03
One shared story
Live workspaceAare corridor / Bern, CH04 active locations

4 changes today · latest field note 14:32

Topographic project map of the Aare corridorTerrain contours, a river, a proposed route, and four collaborative field locations.
WGS 8446.9471° N / 7.4524° E

4 changes today · latest field note 14:32

100%
Proposed route / revision 06Last edit by Mara · 14:32 CET

Working principles

Maps work better when the room is shared.

Spatial work should invite people in, preserve the context, and make the next decision easier to see.

  1. 0101 / 03

    Easy for the whole team

    Bring spatial files into a workspace that specialists and non-specialists can explore together.

  2. 0202 / 03

    Built for live collaboration

    Share a room, choose who can view or edit, and keep every contribution connected to place.

  3. 0303 / 03

    Designed to tell the full story

    Combine layers, markers, media, comments, dates, and timelines into one spatial narrative.

Inside a CollMap room

One map. Every layer of the decision.

Upload source data, place field evidence, draw an area, and resolve the conversation without leaving the map.

Open the public demo ↗
An illustration of an authenticated CollMap room with a fixed map tool rail, an open Upload Layer form showing a successfully processed GeoTIFF with Viridis visualization, a dark collaborative map, and a live comments drawer.
  • 01Markers
  • 02Upload layers
  • 03Draw shapes
  • 04Reports
  • 05Comments
  • 06Export / import

Presentation mode

Published views / guided stories

Turn a live room into a spatial story.

Curate views, reveal the right evidence, and guide people through place without flattening the map into a slide.

A CollMap presentation with a published three-view slideshow, per-slide controls, marker and layer visibility lists, a Liverpool map with an open marker information card, three information-card size options, and previous and next view navigation.
Live roomCurated viewsPublished story

How it works

04 moves / one shared room

From raw evidence to a map people can act on.

Keep the work in one continuous context—from the first layer to the decision you share.

  1. Create a room

    Start with a focused workspace and a map your team can share.

  2. Add the evidence

    Layer in spatial files, observations, drawings, photos, and dates.

  3. Invite the team

    Give contributors the right access and keep feedback in context.

  4. Share the decision

    Turn the finished workspace into a clear map or presentation.

Spatial filesShared contextClear decisions

Use cases

From landscape to street level

Built for work that happens somewhere.

01Climate + environment
46.8182° N / 8.2275° E

See change across place and time.

Compare spatial change, organize field observations, and communicate environmental evidence clearly.

02Emergency coordination
OPS / LIVE 14:32 CET

Keep every update on the same map.

Connect locations, live context, and operational notes so teams can move with a shared picture.

03Urban planning
URBAN GRID / ZONE 04

Plan with the people who know the place.

Bring infrastructure data, local context, and team feedback together before the next move.

Your shared picture starts here

46.8182° N
8.2275° E

Put every voice
on the map.

Bring your maps, evidence, and decisions into one place the whole team can understand.